Wednesday, April 24, 2013
Chassis Critical Dimensions
The dimensions for the front control arms were obtained and we will work on the front suspension module based on these dimensions. The upper control arm may need to be made from scratch due to the shock we are considering using which will be a Suzuki GSXR rear shock. We should have a cad rendering soon.
Wednesday, April 17, 2013
Team meeting 4/15/13
On Monday 4/15/13, the team met and looked at some pictures of the motorcycle that was bought over spring break and we also took a look at the project proposal template that was given by professor Hamel during lab hours. We went over the previous labs and also went over the list of documents that we would like to include in our project proposal that where already completed previously as lab assignments such as the PDS, morphological tables, etc. We also delegated assignments to each member that must be completed within a timeline. These assignments are portions of the report that would also be included in the report to be turn in at the end of this semester.
This weekend, the team would meet up at some point and take pictures of the components already acquired and they would be uploaded no later than wednesday 4/24/13.
Subscribe to:
Comments (Atom)